Significant Coal Intercepts at Titiribi Project – 4.3.2013

KEY HIGHLIGHTS

  • Results from the first 4 drill holes at the Titiribi project show significant coal intersections: 591m drilled, 31 coal seams intersected, including 12 seams with intersections in excess of
    0.8m.
  • Significant coal seams intersected within 125m of drill hole depth:
    •  TP-L14-DH08 – 7.3m cumulative thickness between 60m and 68m; and
    • TP-L16-DH06 – 13m thickness between 110m and 124 m.
  • Initial test work has identified the potential for a metallurgical coal product.

pdf-34
Significant Coal Intercepts at Titiribi Project – 4.3.2013